A kitchen remodel in Los Angeles typically costs $50,000 to $75,000 in 2026, with a full range of $30,000 to $100,000 or more, according to GreatBuildz, a Los Angeles service that matches homeowners with contractors. Those are market figures, not a quote. Where your kitchen lands depends mostly on five things: whether the layout changes, the cabinetry, the countertops, the appliances, and what's behind the walls.
Quick Answers
*Market figures from GreatBuildz's Los Angeles kitchen remodel cost guide, updated September 2026. These are third-party market figures, not Arterra pricing.
Below is how those numbers break down, the five things that move your kitchen remodel cost up or down, and what to ask before you compare quotes.
A kitchen remodel in Los Angeles costs anywhere from about $30,000 to more than $100,000 for a custom kitchen with a new layout, based on GreatBuildz's 2026 figures. The spread is that wide because "kitchen remodel" covers three very different projects.
Same footprint, new look. New surfaces, fixtures and finishes in the existing layout.
A new configuration and a better flow, with new cabinets, countertops and upgraded plumbing and electrical.
Gut to studs and built from scratch, often with walls removed, custom cabinetry and premium stone.
A market range tells you what others paid. It doesn't tell you what your kitchen will cost.
Most of a kitchen remodel budget goes to cabinets and appliances, followed by countertops and the plumbing and electrical work. This is how GreatBuildz breaks down a typical Los Angeles kitchen.
| Part of the kitchen | Typical market cost* |
|---|---|
| Cabinets | $10,000 to $25,000+ |
| Appliances | $10,000 to $30,000+ |
| Countertops and backsplash | $8,000 to $12,000 |
| Plumbing and electrical | $3,000 to $10,000 |
| Flooring | $3,000 to $6,000 |
| Fixtures | $1,500 to $2,500 |
*Source: GreatBuildz, September 2026. Labor, design and demolition are on top of these line items, and every kitchen is different.
Five things affect kitchen remodel cost the most: layout changes, cabinetry, countertops and backsplash, appliances, and hidden conditions behind the walls. Each one below comes with a question to ask any contractor you're considering.
Keeping the sink, range and walls where they are is one of the biggest ways to control cost. Relocating a sink, moving a gas line or removing a wall adds plumbing, electrical and sometimes structural work, and it's also typically the point where permits are required.
In Arterra's kitchen projects, cabinetry is usually the largest single cost. The price depends on whether the cabinets are stock, semi-custom or fully custom, how many there are, and details like full-height uppers, panels and built-in organizers.
Material and fabrication both matter. Quartz, natural stone and full-slab backsplashes are priced very differently, and waterfall edges, extra seams and cutouts add fabrication time.
Appliance packages vary more than any other line in the budget. Built-in and panel-ready appliances also change the cabinetry around them, so the choice affects two parts of the price.
Old wiring, undersized electrical panels, outdated plumbing and water damage only show up at demolition. This is where most mid-project price increases come from. We explain how to handle it in why remodeling costs increase mid-project.
If the first quote is above your budget, there are good places to cut and bad ones.
The second list is everything that's hard to fix later without taking the kitchen apart again.
Before You Compare Kitchen Quotes
If you're only replacing cabinets, countertops and appliances without moving plumbing or electrical, typically no. Once you relocate a sink, move a gas line, alter electrical or remove a wall, a permit is typically required. Permit fees are separate from construction. In the City of Los Angeles, permits are issued by LADBS, the Department of Building and Safety. When a permit is required, we handle the process for you.
At Arterra, most kitchen projects typically take 3 to 5 weeks of active construction. Design, selections, material orders and permits come before that, and how long they take depends on your scope, your materials and whether the project needs plan check. A basic refresh can be done in 3 to 4 weeks, and a luxury gut renovation typically runs 6 weeks or more. For a stage-by-stage breakdown, see our kitchen remodel timeline guide.
| Arterra kitchen project | Scope | Construction time |
|---|---|---|
| Manhattan Beach | White oak island, quartz waterfall countertop, new backsplash | 3 to 5 weeks |
| Santa Monica | Shaker cabinetry, quartz waterfall island, new flooring | 4 to 5 weeks |
| Hollywood | Structural wall removed, waterfall island, new cabinetry | 4 to 5 weeks |
| Marina del Rey | Oversized island, full-height backsplash, custom hood | 6 weeks |
Timelines as listed on each Arterra project page. Your timeline depends on scope, permits and material lead times.
Most homeowners do. We set up and seal off the work zone, and keep the rest of the house clean and accessible. Plan for a temporary kitchen setup, since the sink and range will be out of use for part of the project.
Budget depends heavily on scope and finish level, so we give you a real number after an in-home consultation. It's free and takes about an hour.
See how we approach kitchen remodeling in Los Angeles, or look at a detailed written estimate from a real project. Remodeling a bathroom too? Read our guide to bathroom remodel cost in Los Angeles, or browse finished kitchens in our projects. For a whole-house project, see full home remodeling.
Frequently Asked Questions
How much does a kitchen remodel cost in Los Angeles? +
What is the most expensive part of a kitchen remodel? +
How long does a kitchen remodel take in Los Angeles? +
Do I need a permit to remodel my kitchen in Los Angeles? +
Why are kitchen remodel quotes so different from each other? +
Can I live in my house during a kitchen remodel? +
This article is general information as of October 2026, not legal, tax or financial advice. Market figures come from third-party sources and are not Arterra pricing. Timelines and costs are typical ranges, not a quote or a guarantee. Permit requirements vary by scope and property, so confirm them with LADBS or a licensed professional before you make decisions.

Tom, Founder of Arterra Design & Build
Tom started Arterra to solve one of the biggest frustrations homeowners have with remodeling: not knowing who's in charge, or who to turn to with a question. He built the team and process around clear communication and accountability, from the first walkthrough through the final details. CSLB License #1114133.
We look at the space, the layout and what you want to change, then give you a detailed written estimate.
Free in-home consultation · Los Angeles
A free in-home consultation and a detailed written estimate, based on your actual space. No pressure, no commitment.
Book a Free Consultation150+ Five-Star Reviews · CSLB #1114133 · $2M Insured
Six recent Los Angeles kitchens, designed and built by our team.

Two walls removed, a waterfall island, custom cabinetry and a full slab backsplash.
View Project →
A fluted white oak island, a quartz waterfall countertop and brushed brass hardware.
View Project →
Mixed white and charcoal cabinetry, an oversized island and a custom integrated hood.
View Project →
Deep navy shaker cabinetry, a quartz waterfall island and white subway tile.
View Project →
A structural wall removed, an exposed wood beam and an oversized waterfall island.
View Project →
European frameless cabinetry, an oversized island and marble countertops.
View Project →Copyrights © 2026. Arterra Design & Build. All Rights Reserved.