Bathrooms for Marina del Rey condos, townhomes and canal-side homes: walk-in showers, custom vanities and spa-style primary baths, built watertight by one licensed team that also handles your LA County permits and prepares everything your HOA asks for.

A bathroom that keeps its layout usually takes 2–4 weeks of construction. A full primary bathroom with a new layout typically takes 5–7 weeks. Marina del Rey is unincorporated Los Angeles County, so permits come from LA County Public Works, not the City of LA, and most condo buildings require HOA approval first. Arterra Design & Build (CSLB #1114133) prepares both and waterproofs every wet area before tile goes on.

These three bathrooms are from our recent work in Del Rey, the neighborhood right next to Marina del Rey. Two of them, the primary bath and the terracotta bath, are part of the same whole-home remodel. Each one was designed and built by our team with warm materials and brushed brass details, and the same approach carries over to Marina del Rey condos and canal-side homes.
A floating wood double vanity with wall-mounted brushed brass faucets, organic oval brass mirrors and white pendant lights. Behind it, a narrow walk-in shower with a tiled half wall, fixed glass and an exposed brass rain shower system, all wrapped in soft blush large-format tile.




Vertical terracotta tile from floor to ceiling, a ceiling-mounted brass rain head with handheld shower and recessed niche, and a frameless glass panel. At the vanity, a hand-carved natural stone vessel sink under a wall-mounted brass faucet and a brass pivot mirror.
Small footprint, big atmosphere: this was a compact room, so every inch had to work. We fit a full walk-in shower and vanity into the small space and used the warm terracotta tile and natural stone to give it a real sense of atmosphere.




A deep tub-shower combo with a fixed glass panel, brass-framed recessed niche and brushed brass rain shower, set in blush large-format and vertical stacked tile. The floating walnut double vanity has a white quartz top and two brass gooseneck faucets.




Swap a dated tub for a full-width walk-in shower with glass, a bench and a niche. One of our most requested condo upgrades.
Double vanity, larger shower, better lighting and storage, without moving plumbing walls.
Fast, high-impact updates for rentals and guest rooms: tile, vanity, fixtures and lighting.
Real bathroom reviews from our clients on Google, Yelp and Houzz. Some of them mention ALR Remodeling, our earlier company name.
“The folks at Arterra are real professionals. They are super straightforward, friendly and transparent about pricing. We value quality of service very highly and the Arterra team did not disappoint. They were extremely communicative throughout our bathroom remodel and rolled with the punches as we encountered challenges along the way. The craftsmanship is beautiful and they obviously take great pride in their work.”
“We hired Arterra for a bathroom remodel last month. We were able to get started right away and they finished in 15 days. They had guys here working 6 days a week. Every guy that stepped foot through the door was very respectful and hard working. They accepted my feedback and handled my requests very well. Tom and Levi were very kind and on top of it. The text thread was very active and made sure everything stayed on schedule.”
“We’ve been looking to do a custom bathroom remodeling around our suite and master bathrooms. After going through about 5 contractors I can confidently say I couldn’t be happier going with ALR! They’ve presented us a detailed quote, laying out all the steps and have kept us updated with pictures and timelines throughout the project.”
“We renovated two bathrooms and did a major overhaul to our yard. We chose several specialty items that required very specific installation and a high level of attention to detail. The team took the time to understand our expectations and consistently approached the work with professionalism and care. … Tom, the owner, checked in frequently and was genuinely invested in making sure we were happy with the results.”
“I wanted to give a good word to Tom & Levi from ALR remodeling for walking me and my wife through a wonderful experience remodeling our Master Bathroom. They were prompt and professional, keeping us updated via group chat and photos, the work was completed within the given timeframe and budget.”
“We didn’t touch the footprint, but the team still made our bathroom feel twice as big. Their design was simple: swap the tub for a full-width shower, move the toilet by two feet, and go with open shelving instead of bulky cabinets. It worked. The lighting is better, and nothing feels cramped anymore. The remodeling crew showed up early and stayed consistent. We loved that they didn’t try to sell us on things we didn’t need. Everything works better now. It was the right kind of remodel; smart and calming.”
“ALR Remodeling did an amazing job on our new bathroom! Special thanks to Levi and Tom for their excellent craftsmanship and attention to detail. They kept us informed every step of the way, and we’re thrilled with the results.”
“We hired these gentlemen to refresh our bathroom with new tiling, paint, flooring and tub installation and they were just lovely!! Excellent price, beautiful work and very communicative and kind!”
We design every bathroom in 3D first, so you approve the layout and finishes before construction starts. The consultation and estimate are free.
A free visit to your home, then a written, line-by-line estimate.
Meet with a professional designer at no extra cost, choose your finishes and see your new bathroom in 3D before anything is built. Then we handle drawings and permits, and prepare everything your HOA asks for.
A dedicated crew, a protected work zone and Monday photo updates.
A final walkthrough together and a 1-year workmanship warranty.



Remodeling the kitchen too? See our Marina del Rey kitchen remodel or our main Los Angeles bathroom remodeling page.
Also nearby: Kitchens in Marina del Rey · Remodeling in Culver City · Bathrooms in West Hollywood · Kitchens in Venice
A bathroom that keeps its layout usually takes 2–4 weeks of construction. A full primary bathroom with layout changes typically takes 5–7 weeks. HOA approval and County permits can add time before work starts.
Yes. On every Arterra project you meet with a professional designer, at no extra cost, and see your new bathroom in 3D, including the layout, tile, vanity and fixtures, before any demolition. Changes are made on screen, not on site.
Marina del Rey is unincorporated Los Angeles County, so permits come from LA County Public Works Building & Safety, not LADBS. We handle the application and inspections.
We install a continuous waterproofing membrane on shower walls and the shower pan, seal every penetration and flood-test the pan before any tile is installed.
Yes. We remove the tub, rebuild and waterproof the shower pan, and can add a bench, niche and glass enclosure. In most condos this doesn't require moving the drain far.
Usually, yes. Most associations ask for plans, the contractor's license and insurance certificate, and agreed work hours. We prepare it and coordinate with your building manager.
Yes. CSLB License #1114133, $2M general liability insurance and workers' compensation. Every project includes a 1-year workmanship warranty.
Start with a free in-home consultation. Then meet with a professional designer, at no extra cost, and see your new bathroom in 3D before construction begins.
We respond to every request within 2 business hours · Sunday–Friday 8:30am–8pm · office@arterradb.comCopyrights © 2026. Arterra Design & Build. All Rights Reserved.