Building an ADU in Los Angeles typically costs $120,000 to $150,000 for a garage conversion and $150,000 to $400,000 for a new detached unit in 2026, according to GreatBuildz, a Los Angeles service that matches homeowners with contractors. Those are market figures, not a quote. Where your ADU lands depends mostly on five things: the type of ADU, its size, your site and utilities, the finish level, and plans, permits and fees.
Quick Answers
*Market figures from GreatBuildz's Los Angeles ADU cost guide, updated July 2026. These are third-party market figures, not Arterra pricing.
Below is how ADU cost breaks down by size, the five things that move the number up or down, and what to ask before you compare quotes.
An ADU in Los Angeles costs from about $120,000 for a garage conversion to $400,000 for a two-story detached unit, based on GreatBuildz's 2026 figures. Size and type explain most of that spread.
| Type and size | Typical market cost* |
|---|---|
| Garage conversion | $120,000 to $150,000 |
| New ADU, 400 to 500 sq ft | $150,000 to $200,000 |
| New ADU, 600 to 800 sq ft | $200,000 to $250,000 |
| New ADU, 800 to 1,000 sq ft | $250,000 to $300,000 |
| New ADU, 1,000 to 1,200 sq ft | $300,000 to $350,000 |
| Two-story ADU | $350,000 to $400,000 |
*Source: GreatBuildz, July 2026. Every lot is different, and site conditions can move a project outside these ranges.
A market range tells you what others paid. It doesn't tell you what your lot will cost to build on.
A smaller ADU costs more per square foot because the expensive parts don't shrink with the floor plan. Every ADU needs a kitchen, a bathroom, utility connections, plans and permits, whether it's 400 square feet or 1,000. GreatBuildz puts a new ADU at roughly $300 to $450 per square foot, with larger units at the lower end of that range. That's why a price per square foot is a rough guide and not a way to budget.
Five things affect ADU cost in Los Angeles the most: the type of ADU, its size and layout, the site and utilities, the finish level, and plans, permits and fees. Each one below comes with a question to ask any contractor you're considering.
A garage conversion reuses an existing structure, so it's usually the least expensive path. An attached ADU shares a wall with the house. A detached ADU is a new building with its own foundation, framing and roof, which makes it the most expensive and the most flexible. We compare the first and last option in our guide to garage conversion to ADU in Los Angeles.
More square footage costs more in total, but bedrooms and bathrooms matter as much as size. A second bathroom or a full-size kitchen adds plumbing, fixtures and cabinetry that a larger living room doesn't.
This is the part no online calculator can see. The distance to the sewer line, the capacity of your electrical panel, the slope of the yard and how equipment reaches the back of the lot all affect the price. Two identical ADUs can cost very different amounts on two different lots.
A rental unit with durable, standard finishes and a guest house built to match a custom main home are different budgets. Cabinetry, countertops, tile, windows and doors are where the finish level shows up in the price.
Soft costs come before construction starts. GreatBuildz estimates $8,000 to $20,000 for building plans and $5,000 to $20,000 for permits and city fees. California law helps here: an ADU with 750 square feet or less of interior living space can't be charged impact fees, and school districts can charge school fees only on ADUs larger than 500 square feet. Utility connection fees and capacity charges are separate and can still apply.
Fee rules: California HCD ADU Handbook, updated March 2026. In the City of Los Angeles, ADUs are reviewed by LADBS.
If the first quote is above your budget, there are good places to cut and bad ones.
The second list is what makes the unit legal, safe and insurable. An unpermitted ADU can cost more to fix later than it saved up front.
Before You Compare ADU Quotes
At Arterra, a garage conversion typically takes 3 to 5 months and a detached ADU typically takes 8 to 12 months, from signed contract to Certificate of Occupancy. Roughly half of that is design and permits, and the other half is construction. Under California law, when there is already a home on the lot, the city must approve or deny a complete ADU application within 60 days.
We check setbacks, utilities and zoning, then design the unit and prepare the plans.
We submit to LADBS and track every correction. This is the least predictable part.
Foundation through finishes, then final inspection and a 1-year workmanship warranty.
Generally yes, but only on the value the ADU adds, not on your entire property. County assessors treat an ADU like a home addition: the new construction is assessed when it's completed, and under Prop 13 your existing home keeps its current assessed value. Ask your county assessor or a tax professional how this applies to you before you build.
An ADU price depends on the lot as much as the unit, so we don't quote a number until we've walked the property.
See our ADU construction services in Los Angeles, or read why remodeling costs increase mid-project to see how to keep a large project on budget. Planning other work on the house? We also have guides to kitchen remodel cost and bathroom remodel cost in Los Angeles, and you can browse finished work in our projects.
Frequently Asked Questions
How much does it cost to build an ADU in Los Angeles? +
What is the cheapest type of ADU to build? +
How much does an ADU cost per square foot in Los Angeles? +
Do I have to pay impact fees on an ADU in California? +
How long does it take to build an ADU in Los Angeles? +
Will an ADU increase my property taxes? +
This article is general information as of October 2026, not legal, tax or financial advice. Market figures come from third-party sources and are not Arterra pricing. Timelines and costs are typical ranges, not a quote or a guarantee. ADU rules change and vary by city and by property, so confirm the requirements for your lot with LADBS or a licensed professional before you make decisions.

Tom, Founder of Arterra Design & Build
Tom started Arterra to solve one of the biggest frustrations homeowners have with remodeling: not knowing who's in charge, or who to turn to with a question. He built the team and process around clear communication and accountability, from the first walkthrough through the final details. CSLB License #1114133.
We walk the property, check setbacks and utilities, then give you a detailed written estimate.
Free in-home consultation · Los Angeles
A free property walkthrough and a detailed written estimate, based on your actual lot. No pressure, no commitment.
Book a Free Consultation150+ Five-Star Reviews · CSLB #1114133 · $2M Insured
Two recent Los Angeles projects, designed, permitted and built by our team.

A detached ADU and pool house built as an extension of the main home, from planning and permits to final finish details.
View Project →
A full room addition, new roof framing, an electrical panel upgrade and a complete exterior renovation.
View Project →Copyrights © 2026. Arterra Design & Build. All Rights Reserved.